Modular homes are the kind of homes that are built in a factory setting in modules. Each module is constructed separately and independently before all the modules are joined together to form a single structure. The quality control department of the company that is doing the building usually inspects the process of production carefully to ensure standards are followed. Thus, in the end all modules meet the same quality standards. Here are facts regarding South Hill VA modular homes.

Unlike traditionally constructed homes, modular homes are not affected by weather elements. As such, unfavorable weather does not interfere with the process of constructing these homes. This leads to faster production of these houses. The construction process can still take place at night by having a nightshift crew working at night. This also contributes to faster production.

Traditional construction of houses is affected by several factors like weather. When a storm comes, all construction activities have to be stopped until the storm passes. Also, the construction takes place during the day only in most instances, with the crew going back to their houses in the evening. This brings about delay in the construction. The house ends up taking up to several months to be completed and be ready for occupation.

The ease of constructing modular houses is making many people to shift to these kinds of houses. It takes an average of four weeks to produce a module. The constructed modules are protected against weather elements using a special material when they are being transported to the site of installation. Trucks are used for the transportation from the factory to the site of consumption..

The site of installation usually has a foundation made in advance. The modules are installed onto the foundation one by one. A crane is usually used to help with unloading the modules from the truck on which they are delivered. The crane places the module onto the foundation in the right position, which is also planned in advance.

Although the mean time for construction of the modules is 4 weeks, the time may vary a lot. Factors such as the design of the structure usually determine how long the duration takes. Complex structures take long due to the fact that there is a lot of designing and planning that is involved. The size of the structure will also determine the duration because structures with more modules require more time.

Extra time is needed to complete the installation process. The construction company or local builders can be hired to complete the installation. It is the client who determines who will do the installation. However, most production companies prefer to complete the process. The job can be assigned to either an outsider contractor or the construction company by the client because it is their choice.

It is vital for one to realize that modular houses are not similar mobile houses. Ability to be moved is the first distinction between these two types of houses. Mobiles homes can be moved but modular homes cannot be moved. Modular houses are installed on foundations that are permanent which hinders them from being moved.